The following items are checked on the point tab of the Project Review Pane.
Point Status: Maximum mark residual
Point Status: RMS mark residual
Point Status: Number of photos used
If any of these fields are weaker than the threshold specified for the project type on the Project Review Settings Dialog the point tab of the Project Review Pane will list the points with the weak fields in a grid. The weak fields will be highlighted.
An important feature that makes the Project Review pane a powerful tool for finding and fixing problems is that by clicking on a row in the grid, the point will be highlighted in all open views. Clicking on this grid does not affect selection as the ‘review highlight’ is independent of the selection. The review highlight is described in Project Review Highlight.